The Tehri Dam is the highest dike in India. 2nd highest in Asia and 8th highest in universe. It is a multi-purpose stone and earth-fill embankment dike on the Bhagirathi River near Tehri in Uttarakhand. India. It is the primary dike of the THDC India Ltd. and the Tehri hydroelectric composite. Phase 1 was completed in 2006. the Tehri Dam withholds a reservoir for irrigation. municipal H2O supply and the coevals of 1. 000 MW of hydroelectricity. One more undertaking of the installed capacity of 1. 000 MW pumped storage hydroelectricity are under building. [ 1 ] |

History

A preliminary probe for the Tehri Dam Project was completed in 1961 and its design was completed in 1972 with a 600 MW capacity power works based on the survey. Construction began in 1978 after feasibleness surveies but was delayed due to fiscal. environmental and societal impacts. In 1986. proficient and fiscal aid was provided by the USSR but this was interrupted old ages subsequently with political instability. India was forced to take control of the undertaking and at first it was placed under the way of the Irrigation Department of Uttar Pradesh.

However. in 1988 the Tehri Hydro Development Corporation was formed to pull off the dike and 75 % of the support would be provide by the federal authorities. 25 % by the province. Uttar Pradesh would finance the full irrigation part of the undertaking. In 1990. the undertaking was reconsidered and the design changed to its current multi-purpose. [ 1 ] Construction of the Tehri Dam was complete in 2006 while the 2nd portion of the undertaking. the Koteshwar Dam. is about complete with two out of four generators operational. The other two are expected to be commissioned in March 2012 while the wired storage power planned is slated for commissioning in February 2016. [ 2 ]

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

Technical description

The dike is a 260. 5 meters ( 855 foot ) high stone and earth-fill embankment dike. Its length is 575 meters ( 1. 886 foot ) . crest width 20 meters ( 66 foot ) . and basal breadth 1. 128 meters ( 3. 701 foot ) . The dike creates a reservoir of 2. 6 three-dimensional kilometers ( 2. 100. 000 acre·ft ) with a surface country of 52 square kilometers ( 20 sq myocardial infarction ) . The installed hydrocapacity is 1. 000 MW along with an extra 1. 000 MW of wired storage hydroelectricity. The Tehri Dam and the Tehri Pumped Storage Hydroelectric Power Plant are portion of the Tehri Hydropower Complex which besides includes the 400 MW Koteshwar Dam downstream. [ 1 ] The composite will afford irrigation to an country of 270. 000 hectares ( 670. 000 estates ) . irrigation stabilisation to an country of 600. 000 hectares ( 1. 500. 000 estates ) . and a supply of 270 million imperial gallons ( 1. 2?106 M3 ) of imbibing H2O per twenty-four hours to the industrialised countries of Delhi. Uttar Pradesh and Uttarakhand.

Environmental issues

The Tehri Dam has been the object of protests by environmental organisations and local people of the part. In add-on to the human rights concerns. the undertaking has spurred concerns about the environmental effects of turn uping a big dike in the delicate ecosystem of the Himalayan foothills. There are farther concerns sing the dam’s geological stableness. The Tehri dike is located in the Central Himalayan Seismic Gap. a major geologic mistake zone. This part was the site of a 6. 8 magnitude temblor in October 1991. with an epicentre 500 kilometers ( 310 myocardial infarction ) from the location of the dike. Dam advocates claim that the composite is designed to defy an temblor of 8. 4 magnitude. but some seismologists say that temblors with a magnitude of 8. 5 or more could happen in this part [ commendation needed ] . Were such a calamity to happen. the potentially resulting dam-break would submerse legion towns downstream. whose populations total near half a million.

The protest message against Tehri dike. which was steered by Sundarlal Bahuguna for old ages. It says “We don’t want the dike. The dike is the mountain’s devastation. ” The resettlement of more than 100. 000 people from the country has led to drawn-out legal conflicts over resettlement rights. and finally resulted in the project’s delayed completion. Since 2005. filling of the reservoir has led to the reduced flow of Bhagirathi H2O from the normal 1. 000 three-dimensional pess per second ( 28 m3/s ) to a mere 200 three-dimensional pess per second ( 5. 7 m3/s ) .

This decrease has been cardinal to local protest against the dike. since the Bhagirathi is considered portion of the sacred Ganges whose Waterss are important to Hindu beliefs. At some points during the twelvemonth. the fiddling with Bhagirathi Waterss means this tributary Michigans fluxing. This has created bitterness among many Hindus. as the holiness of the Ganges has been greatly compromised for the coevals of electricity. Though the functionaries say that when the reservoir is filled to its maximal capacity the flow of the river will once more go normal. In malice of concerns and protestation. operation of the Tehri Dam continues.

Scheduling and Generation Despatch

The Scheduling and Despatch of the Tehri Hydro Power works is done by Northern Regional Load Despatch Centre which is the vertex organic structure to guarantee the incorporate operation of the power system grid in the Northern part and comes under Power System Operation Corporation Limited ( POSOCO ) . At present. THDC India Ltd. is bring forthing around 3000 million Unit of energy yearly from this dike.

Tehri Dam Information

Tehri Dam is the biggest dike in Asia. It is situated on Bhagirathi river in Uttarakhand. India. It is stone and Earth filled monolithic H2O barrier. Tehri Hydro Development Coorporation ( THDC ) was formed in 1988 to pull off the dike. The dike started working in 2006.

Electricity coevals

Tehri dike generates 1000 MW of hydroelectricity along with an extra 1000 MW of wired storage hydroelectricity ( to be completed in 2013 ) . The Tehri Hydropower Complex besides includes 400 MW Koteshwar dike downstream.

Resettlement of locals

The resettlement of more than 100. 000 people from the country has led to drawn-out legal conflicts over resettlement rights. and finally resulted in the project’s delayed completion. Peoples populating near the Tehri dike on the Bhagirathi river in Uttarakhand are in problem. Villages on the inclines overlooking the reservoir are threatened by increasing landslides and those living downstream. one time ousted for the edifice of the dike and rehabilitated. are losing their new places to an airdrome enlargement undertaking.

Dangers with Tehri Dam

The Tehri Dam has been the object of active protestation by environmental organisations and local people of the part. In add-on to the human rights concerns. the undertaking has spurred concerns about the environmental effects of turn uping a big dike in the delicate ecosystem of the Himalayan foothills.

There are farther concerns sing the dam’s geological stableness. The Tehri dike is located in the Central Himalayan Seismic Gap. a major geologic mistake zone. This part was the site of a 6. 8 magnitude temblor in October 1991. with an epicentre 500 kilometer from the location of the dike.

Dam advocates claim that the composite is designed to defy an temblor of 8. 4 magnitude. but some seismologists say that temblors with a magnitude of 8. 5 or more could happen in this part. Were such a calamity to happen. the potentially resulting dam-break would submerse legion towns downstream. whose populations total near half a million.

Safety of Tehri Dam

Since Tehri dike is Rock and Earth filled dike. it is strong plenty to defy an temblor of 8. 4 magnitude. Besides like other dikes. in instance of breakage. the Tehri dike will non fall in all of a sudden.

Construction and contention

About 20 old ages after its origin. the contention over building of the 2400-megawatt Tehri Dam has eventually ended. Or so it seems. There is non even a mutter of protest against the dike. Except. of class. the septuagenarian conservationist. Sunder Lal Bahuguna. who is go oning with a alone conflict. both in the tribunals and outside. against it. But occupants of Tehri town and adjoining small towns which are to be submerged one time the reservoir is filled. look to hold deserted him. Of class. there is bitterness and choler among the people against the Government. But non on building of the dike but against the rehabilitation bundle given to them by the disposal. This when over 90 per cent of Tehri evacuees have already been paid compensation. given alternate adjustments and occupations. The Tehri town. with a population of 25. 000. which will be submerged with brassy inundations in the Bhagirathi after completion of the 661-metres high caisson dike. is. nevertheless. still hustling with activity. There is no evident concern among the people about this or for that affair over the inevitable emptying after the completion of the chief dike. three old ages subsequently.

The accent is on the sum of compensation one can pull out from the Government. Work on the Tehri dike is about three-fourths complete. The caisson dike has been constructed by deviating the Bhagirathi and Bhilanga rivers into tunnels. Mountains environing the prospective reservoir have been fortified by utilizing steel and cement. Diversion tunnels for power coevals excessively are complete. What now remains to be done is increase the tallness of the caisson dike to organize the chief dike and installing of turbines for power coevals. The Tehri Hydro Development Corporation’s ( THDC ) M. P. S. Tyagi hopes to “dedicate the dike to the nation” by the terminal of 2000. Tyagi. armed with a figure of experts’ studies and proficient informations. claims that building of the dike would non increase seismal activity in the Himalayan mountains. “If anything. it would be a moistener for seismal activities. ” he says. But Bahuguna remains unimpressed: “

They are making an environmental catastrophe. I will contend till my last breath against the undertaking. ” The initial undertaking cost of Rs 192 crore when work started on it in 1978. has now become Rs 6. 000 crore chiefly due to the hold caused by anti-dam protests. Each one twelvemonth hold escalates the dike cost by Rs 300 crore. Tyagi claims. Now with thinning support for the anti-dam anteroom led by Bahuguna the cost is non expected to travel up farther. “Bahugunaji negotiations merely of halting work on the dike. He doesn’t utter a word about payment of compensation to the evacuees” says a local occupant explicating the dwindling support to Bahuguna’s motion. The emphasis of the people hence. is non on whether the dike should be built or non but on the sum of compensation. Tehri is a hill town linked to Rishikesh. Gopeshwar and Srinagar. it besides serves as a large concern Centre. Bing a territory headquarter. it is besides place for the working categories.

Though most of the Government offices have been shifted to New Tehri Town ( NTT ) . about 24 kilometers from Old Tehri. the chief concern Centre is still in the old township. The dike once functional would submerse the places of 4. 551 households in Tehri town. but harmonizing to Tyagi most of them have already been rehabilitated. THDC has already provided land to 2. 283 households. constructed houses for 1. 701 households and stores for 451. go forthing merely 116 households which are yet to be rehabilitated. Similarly. of the 2. 064 households to be displaced from 27 small towns. 2. 034 have been paid compensation for the land and houses to be submerged. Tyagi says. The dike would impact 9. 290 households in 107 small towns of which 27 small towns will be wholly submerged and 80 partly — merely the agricultural land of the villagers will be submerged and non the residential vicinities. The small towns. harmonizing to Tyagi. are being rehabilitated at 11 different topographic points in Hardwar and Dehradun territories.

Villagers. nevertheless. challenge his claim by stating they were being given excessively small to counterbalance their land. THDC functionaries claim that as against merely 6. 9 per cent irrigated land of the evacuees. they were being provided 100 per cent irrigated land. But the difference on the country and cost of the land still rages on. Villagers besides resent THDC’s definition of `partially affected’ small towns. “If our land is submerged. what will we eat. ” asks N. S. Gairola. Tehri territory disposal and THDC functionaries both contend that they have already paid the compensation as per the study conducted on June 6. 1985. But. a figure of pending judicial proceedings in assorted tribunals falsify their claims. THDC functionaries attribute the differences on the hoggishness of the local people. Some people still populating in their original houses in Tehri town or small town. had already sold off the land or house given to them as compensation. merely to higgle for more. they contend.

The THDC’s major hurdle in doing the dam functional is displacing the original dwellers. The functionaries tried to frighten away the people in the past two old ages by raising the bogy of inundations due to building of the caisson dike. “In instance of heavy rains in the catchment country or upstream in the river. there is a distinguishable possibility of one time in a century flash inundations. therefore pass overing out the full Tenri town. ” Tyagi warned in a missive to the Uttar Pradesh and the Union Government. Bahuguna calls the menace of inundations a fraud meant to frighten away the occupants of Tehri town. “My abode. Himalaya Kuti. is at the lowest point in the full vale.

If there are inundations I will be the first to acquire affected. But. I am non running off from such hollow menaces. The town is at a tallness of 700 meters from sea degree while the caisson dike is merely 661 meters high” he says. The THDC functionaries hope that Tehri occupants will finally resign the topographic point before the tunnels are closed and the H2O degree crestless waves in the vale after completion of the dike. “We have got three and a half old ages to carry them to resign the topographic point and we hope to succeed” says an official engaged in rehabilitation work. Tehri dike poses menace to small towns in Uttarakhand

Posted on January 16. 2008 by eUttaranchal
Dehradun. 16 Jan 2008

The Tehri dike. one of the largest dike in Asia. is one time once more in contention. as its lake is presenting menace to a figure of next small towns in Uttarakhand. The houses in a figure of next small towns have developed clefts. The villagers say that the clefts are because of the dike. but the local disposal says that it is still look intoing complains of the villagers. “Cracks have been seen in some topographic points in the small town and since the H2O degree is withdrawing. this country is under survey. Once the probe is over. some decision will be derived. ” said U. D Chaubey. DistrictMagistrate of Tehri. The country was declared sensitive manner back in 1989-1990. Around 12 small towns are reportedly under serious menace with Kangsali. Nakot. Raulakot and Bhallargaon Villages being the worst affected.

A batch of houses in these small towns have developed clefts and the villagers have been passing insomniac darks. “In our small town Nakot. there are clefts all over in the houses because of the lake. Peoples have to remain awake in the dark. This small town is in danger. Everywhere houses have developed clefts. ” said Bhau Singh. a occupant of Nakot small town. Built manner back in 1978. the Tehri Dam on India’s Bhagirathi River. is one of the world’s largest and most controversial hydroelectric undertakings. With a tallness of 260 metres ( 855 pess ) . the reservoir of the dike. the 5th highest in the universe wholly submerged historic Tehri Town and 40 small towns while partly submersing 72 small towns impacting about 100. 000 people. ( ANI )

For the last 12 old ages building has continued unabated on India’s Tehri Dam amidst staunch resistance. monolithic environmental debasement and societal turbulence. Even deficiency of sufficient financess has non stopped this monstrous. concrete Juggernaut ; it has been traveling along in phases. with money acquired from province and national budgets. At present. the four H2O recreation tunnels ( two on the Bhilangana River and two on the Bhagirathi River ) are complete ; work is about finished on the four head-race tunnels that bore deep into the versant to where the turbines will be housed. which will finally bring forth. harmonizing to the Dam Authority. 2. 400 megawatts ( mw ) of power. Construction on the existent dams-the monolithic Tehri Dam. a caisson dike merely upstream of the existent dike site. and the smaller Koteshwar Dam about 20 kilometers downstream-has non yet begun ; the Indian authorities has had trouble funding the undertaking since its origin.

In the interim. bulldozers and trucks have been grating roads out of the versants and constructing lodging settlements for the applied scientists and workers. churning up stone and soil and lodging it onto the town of Tehri and its environments. The lone evident intent for all this disturbance is to maintain the undertaking alive. The vale is now covered with soil and rubble. and every life tree and works is coated with a dried bed of Earth. strangulating respiration. During Soviet leader Mikhail Gorbachev’s visit to India in November 1986. a Soviet economic assistance bundle for India’s atomic plan all of a sudden fell through due to Indian resistance. In an effort to salve the prestigiousness of the visit. a undertaking was quickly sought that would win Soviet and Indian blessing. As a consequence. Indian Prime Minister Rajiv Gandhi and Gorbachev signed an understanding on the Tehri Dam undertaking. which had been smouldering on a back burner for many old ages.

The undertaking is now heating up one time once more. its coals fanned by international political relations and other concern concerns. But the dwellers of the territory of Tehri are coughing to catch their breath. Local resistance. which began in 1978 with the formation of the Tehri Bandh Virodhi Sangarsh Samiti ( the Anti-Tehri Dam Struggle Committee ) . now encompasses the full vale and beyond. Many successful nonviolent presentations have been staged. during which many were arrested and jailed. particularly in the early yearss of the run. Since the sign language of the understanding between India and the USSR in 1986. international resistance has gained impulse.

Environmental Consequences of the Undertaking

The undertaking proposes to build one of the five largest rock-and-earth-filled dike in the universe about a half-mile downstream from the sacred meeting of the Bhilangana and Bhagirathi ( Ganges ) rivers. The town of Tehri. the territory central office for the full Garhwal part of the Himalaya and place to more than 20. 000 people. would lie straight behind it. The dike would lift to a tallness of 260. 5 metres and stretch to 1. 100 metres broad at its base. The reservoir behind this formidable wall would stretch over 70 kilometers long. 40 km up the Bhagirathi vale and 35 kilometer up the Bhilangana. The vale contains the region’s best agricultural land. The reservoir would displace over 100. 000 people. Mr. V. D. Saklani. attorney and laminitis of the Anti-Tehri Dam Struggle Committee. is speedy to indicate out the obvious effects of such a big undertaking. Fearing heavy siltation due to logging in the Himalayan watershed. he states that the expected life span of the dike will be about 35 old ages. compared to the 100 old ages claimed by the Dam Authority.

Is the US $ 2 billion being spent on the undertaking and the human supplanting presently taking topographic point worth merely a light 35 old ages of electricity? Mr. Saklani besides notes that the extremely absorptive shale. customary in the vale. makes the inclines susceptible to frequent slides. Once the reservoir fills. landslides from above the submerging line will further rise and intensify the siltation job. In fact. landslides are already a job as a consequence of the deforestation and road-building now in advancement. One of the largest proficient jobs of the Tehri Dam. nevertheless. has to make with a little-researched phenomenon known as R. I. S. or Reservoir Induced Seismicity. Datas are sorely missing on the effects of a big organic structure of H2O on a geologic mistake. and the site of the Tehri Dam rests in an country prone to temblors. The region’s last major temblor occurred in 1935 ; experts agree that mounting force per unit area could take to an temblor of 8. 0 or more on the Richter graduated table. The authorities of India late appointed a working group to look into these allegations. which submitted its findings in early 1986.

The authorities commission. headed by Sunil K. Roy. strongly opposed the building of the dike and offered options. The authorities has chosen to disregard the findings of its ain commission and continues to follow a potentially destructive way. Mr. Saklani and Sunderlal Bahugana of the Chipko Andolan ( and one of the recent receivers of 1987’s Right Livelihood Award ) are presently contending the building in India’s Supreme Court. They are establishing their writ request on the likeliness of a catastrophe – that the compounded weight of the H2O in the reservoir will trip the mistake into a annihilating temblor. Mr. Saklani states that a possible temblor could check the dike. ensuing in a catastrophe unknown in human history. The downstream populations in the holy metropoliss of Devaprayag. Rishikesh and Haridwar ( of import sites of Indian acquisition and pilgrim’s journey ) would be wiped off the face of the Earth.

Hundreds of 1000s of people would be killed ; 1000000s more along the Bankss of the sanctum Ganges ( Ganga ) would be straight affected. These “ifs” have non daunted the Dam Authority: the Soviet applied scientists have merely proposed raising the tallness of the dike and increasing the breadth at its base to 1. 500 metres. Sardar Prem Singh. secretary of the anti-Tehri battle group. points out that if the dike is constructed and the flow of the sacred river impeded ( the Bhagirathi becomes the holy river Ganges when it meets downstream with the Alakananda at Devaprayag ) . the full Gangetic vale will endure as a effect. Silt. brought down from the upper ranges of the catchment and incorporating valuable mineral sedimentations. will be caught behind the dike strangulating the sanctum river. This has tremendous effects for all who live on the Gangetic field ; to hold the flow of this natural fertiliser could do terrible agricultural jobs in the foreseeable hereafter. perchance even dearth.

Social Consequences of the Undertaking

But what of the societal impacts of the dike undertaking? What of the 100. 000 people presently being affected by the dam’s building? The Dam Authority and the Government of India’s Planning Commission have non sufficiently dealt with this job. Sunderlal Bahugana points out that the dam’s societal and human-centered impacts have been wholly ignored. Statisticss show that over two-thirds of those to be relocated unrecorded in little small towns in the vale that fall below or in the locality of the submerging line. In their forced resettlement. no attending has been given to the dissolution of small town and household units. Although the authorities studies province that communities are to be relocated as a whole and equal land and pecuniary compensation is to be given. research workers have found that this is non the instance. Entire households have been split apart and deprived of their lone agencies of economic support. The cultural endurance of these “backward categories. ” who have lived and survived without modern engineering or electricity for centuries. has been ignored. Those already relocated have received unequal pecuniary compensation and unproductive lands.

In the small town of Khandal. over half of the original 50 households have accepted authorities financess and have been relocated to plots near Dehra Dun. a metropolis about a half-day’s journey from the small town. Those staying have refused authorities money and land – they will remain until the authorities forces them to go forth. The staying villagers say that those who moved are unsated with their new land and low outputs ; that H2O is scarce and the Fieldss ill irrigated ; and that harvests are unproductive.

Many of those who moved hold given up and fled to the metropoliss in hunt of occupations. Some have returned to Khandal merely to confront societal banishment by the staying villagers. This scene repeats itself in the many small towns throughout the vale. The authorities is now offering compensation to the occupants of Tehri. It has already distributed money to about one-sixth of the town’s population. payments that many have accepted because they fear the power of the local governments. When these people are forced into resettlement ( scheduled completion of the dike is in 1997 ) . nevertheless. the amount they receive now will be of small usage when they buy new land or seek new places.

The Building of New Tehri Town

The authorities says equal land is available for all oustees in the adjacent vales and nearby on the fields. Sunderlal Bahugana states that. as people settle in antecedently forested countries. farther environmental devastation and increased deforestation will ensue. The Dam Authority has been illicitly infringing upon province and small town land in the locality of New Tehri Town. the country stated to be the new territory central office. harmonizing to Sardar Prem Singh. Government lodging and offices are about completed. But much of the acquired land for New Tehri has been taken without blessing and against the government’s ain Forest Conservation Act of 1980. Because the authorities removed many villagers from their lands to do manner for New Tehri Town. it has now redoubled the refugee job by relocating more people to do manner for already relocated people. Where will this barbarous rhythm terminal? New Tehri Town is quickly nearing completion.

Land was acquired on a nearby mountaintop from small towns that had been at that place for centuries. Concrete. box-like constructions erected like garrison walls in indistinguishable pink and bluish lines along the steep mountain inclines now stand as barbarous memorials to the foolishness of “modern” Indian architecture. None of the occupants of Tehri want to travel to the new metropolis. The lone 1s who will switch will be those whose occupations depend on their moving – the authorities workers and employees associated with the tribunal and the bureaucratism needed to command an full territory. New Tehri is about 4. 000 pess above Tehri. which is located at the underside of the vale. Residents claim they will hold problem accommodating to a colder clime. non to advert the steep inclines of the new town. The site for the new town was chosen because no other land was available anyplace in the territory. The authorities tribunals and offices in Tehri could non be relocated to an bing metropolis in the territory because these are all located on mountaintops with limited land. The Tehri vale holds the lone level land and has the best agricultural land area in the full Himalayan part of the province of Uttar Pradesh.

All other building and development undertakings in Tehri were stopped in 1969. when intelligence of the dike became known. Since so. no new edifices have been constructed. no new undertakings undertaken and no major fixs made to crumpling edifices and potholed roads. Alternatively. all money earmarked for the town’s development has gone into the building of New Tehri. The population of Tehri since 1969 has more than doubled. New schools that were stated for Tehri have alternatively been built in New Tehri. even though the metropolis has no lasting occupants. Children from the old town – kids of New Tehri’s future dwellers – must be bused daily to the schools in New Tehri. The route that presently links the two towns winds a roundabout path from the underside of the vale up to New Tehri. a mountain journey of about 35 kilometer. about two hours by coach. The Dam Authority ne’er conceived of local resistance when a shorter linking route was started a figure of old ages ago.

Villagers in the peaceable crossroadss of Baurori and Pipli. land next to New Tehri and through which the shorter route must go through. hold refused to let go of their lands to the developers. despite the fact that this land has been included in the New Tehri Town program. The villagers have organized their resistance and have succeeded in forestalling building workers from even stepping on their lands. What remains is a completed route from Tehri up the mountain to Baurori and a route from New Tehri down to Baurori’s opposite side – a spread of 4 kilometers in between. Since the villagers have refused to give up their land. the route has been rendered wholly useless. All traffic must go via the longer path. which takes more than an hr than the shorter path. therefore increasing transit and building costs. The villagers have given no mark of bowing to authorities force per unit area. The places in New Tehri will be sold at a fixed monetary value to authorities employees and others who will travel. harmonizing to Sardar Prem Singh. Those in Tehri who have agreed to travel hold non received adequate compensation to afford the prefabricated houses.

How will they be able to afford the new places if they are being compensated now for a move that will non take topographic point for another 10 old ages? Switching the territory tribunals and offices to New Tehri will add a considerable load on the staying villagers in the territory. who might hold to go to New Tehri to settle land differences. legal statements and so on. Tehri. which is down in the underside of the vale. is easy to make and does non necessitate an nightlong stay or considerable disbursal. If a villager on the opposite side of the proposed reservoir needs to travel to New Tehri Town. nevertheless. he or she must go the added length to travel around the reservoir ( if the proposed ferry is non installed in clip ) and up the mountain to New Tehri. a round-trip journey that may take two or three yearss.

The milk sellers and fruit and vegetable agriculturists on the opposite side of the proposed reservoir complain that the dike will direct their transit costs skyrocketing. blow uping monetary values and doing their goods unacceptable to the spoting markets on the fields far below. This would hold the sick consequence of economically lay waste toing an already down part. In the early 1970s. the occupants of Tehri were optimistic that the undertaking would convey plentiful occupations and hike the local economic system. However. non a individual building worker or applied scientist comes from Tehri or its environments: the bulk of the labourers come from little small towns in the province of Bihar. where labour is inexpensive. and the applied scientists come from all over north India. with the exclusion of Tehri. Where will all of these outside workers and employees live?

More woods are destroyed and more roads built to do room for them. Many people are contending this US $ 2 billion undertaking. Dedicated people such as V. D. Saklani. Sunderlal Bahugana and Sardar Prem Singh will non rest until the undertaking is wholly scrapped. World Wildlife Fund-India and a New Delhi-based preservation group called INTACH ( Indian National Trust for Art and Cultural Heritage ) have helped to raise the financess to back up a tribunal instance. At present. the writ request filed in India’s Supreme Court is still pending. The apathetic attitude of the tribunals continues to ensue in a delay of the hearing. have oning down the resources of the resistance. The oppositions of the dike appear certain of triumph. albeit a Pyrrhic triumph. Even if building is halted. what will be done about the environmental devastation and societal turbulence that have already occurred? It will take coevalss to undo the injury already inflicted. but this is work that the oppositions await the opportunity to get down.